A465

A465 Bridge Demolition

Walters complete time critical demolition of highway bridge as part of our wider work on the A465 Heads of the Valleys Section 2 Dualing scheme for Costain and Welsh Government

Read More

A465 Head of the Valleys – Lion Hotel Footbridge Demolition

As part of the ongoing work to upgrade the A465 Heads of the Valley road between Brynmawr and Gilwern, an existing steel footbridge required demolition

Read More

Demolition of a Reinforced Concrete Bridge on the A465

Following appointment, Walters engaged with a trusted, specialist demolition temporary works design partner to jointly study historical records of the bridge construction and develop a safe demolition sequence.

Read More