landfill

Full marks for Walters on final phase of landfill capping

We covered an area exceeding 130,000m2 with soils to a depth of 300mm, smoothing out the uneven surface prior to installing a geosynthetic capping membrane, then finished it off with a further layer of 800mm restoration soil to accept seeding and the reintroduction of flora to the site.

Read More