Another Week Another Footbridge Lifted
This is the tab body content. It is typically best to keep this area short and to the point so it isn't too overwhelming.

On September 4th, we installed a 64m span footbridge over the Afon Cothi at our Twyi Valley Footpath project for Carmarthenshire County Council.

Despite the weather challenges, the complex task of positioning the bridge over the river was carried out seamlessly, thanks to careful planning and close coordination between the teams on site.

The installation was a success, with the bridge lowered precisely into place. Even in the rain, everything ran smoothly, and the structure settled into position perfectly.

Well done to the site team and all our partners for their hard work.

Power: MW
Operational Staus:
Technical Details:
Partners:
Operation: